Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 5 results ...

Bowen, P, Peihua Zhang, R and Edwards, P (2021) An investigation of work-related strain effects and coping mechanisms among South African construction professionals. Construction Management and Economics, 39(04), 298–322.

Ershadi, M, Davis, P and Newaz, M T (2021) Important academic interventions for promoting resilience: The perception of construction management undergraduates. Construction Management and Economics, 39(04), 340–55.

Uusitalo, P, Lappalainen, E, Seppänen, O, Pikas, E, Peltokorpi, A, Menzhinskii, N and Piitulainen, M (2021) To trust or not to trust: is trust a prerequisite for solving design quality problems?. Construction Management and Economics, 39(04), 279–97.

van den Berg, M, Voordijk, H and Adriaanse, A (2021) BIM uses for deconstruction: an activity-theoretical perspective on reorganising end-of-life practices. Construction Management and Economics, 39(04), 323–39.

  • Type: Journal Article
  • Keywords: Activity theory; Building Information Modelling; circular economy; deconstruction; practice; reuse; site management;
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2021.1876894
  • Abstract:
    Despite that Building Information Modelling (BIM) is often praised as a whole life-cycle methodology, possibilities for deconstruction are consistently overlooked. This study demonstrates what those possibilities may be. Previous studies showed that: deconstruction practices pose several site-based challenges; BIM implementations may help practitioners to address such challenges; and activity theory offers a framework to understand BIM implementations. We aimed to explore how deconstruction practices can be reorganised with BIM by applying an activity-theoretical perspective to a rather unique case-study. The selected case concerned the deconstruction of a nursing home so that many of its elements could be reused to construct a school. During this project, we implemented BIM in three essential activities: analysing existing conditions, labelling of reusable elements and planning deconstruction. The implementations resolved initial problems related with the use of traditional drawings, schedules and instructions. They nevertheless also triggered several additional problems that we attempted to address in successive steps. The organisation of the activities so evolved, which culminated in the formation of three new BIM uses for deconstruction: “3D existing conditions analysis,” “reusable elements labelling” and “4D deconstruction simulation”. These concepts complement existing BIM use taxonomies and can be appropriated in future deconstruction projects.

Williams, C C and Kayaoglu, A (2021) Explaining the supply of home repair and renovation services in the undeclared economy: lessons from Europe. Construction Management and Economics, 39(04), 356–68.